CONSTRUCTION UNIT PRICE OF INDUSTRIAL BUILDING, WORKSHOP
Updated: January, 2014
No. |
Item of works |
Unit |
Minimum |
Rate (VND) |
Remark |
1 |
Supply and piling piles |
m |
150 |
320,400 |
D250, Vinakyoei steel, Cap plate 6mm |
2 |
Driving Cajuput Piles |
cây |
100 |
30,000 |
1st grade, straight |
3 |
Demolition pile headwork |
caùi |
30 |
65,000 |
|
4 |
Excavation by handwork |
m3 |
15 |
150,250 |
|
5 |
Excavation by machine |
m3 |
500 |
46,600 |
|
6 |
Filling soil by handwork |
m3 |
15 |
52,500 |
|
7 |
Filling soil by machine |
m3 |
500 |
22,600 |
|
8 |
Sand leveling sub_grade |
m3 |
100 |
265,224 |
well compact |
9 |
Stone agg 0x4 (sub_base) leveling sub_grade |
m3 |
100 |
353,650 |
|
10 |
Disposal surplus soil |
m3 |
100 |
52,500 |
|
11 |
Lean concrete, Grade 100 |
m3 |
10 |
939,439 |
True aggregate and grade |
12 |
Concrete grade 250 |
m3 |
100 |
1,437,169 |
True aggregate and grade |
13 |
Ordinary formwork |
m2 |
100 |
157,475 |
|
14 |
Complicated formwork |
m2 |
50 |
192,270 |
|
15 |
Supply and erection reinforced bar |
kg |
200 |
20,864 |
Steel Vinakyoei, Pomina |
16 |
100mm thick hollow brick wall |
m3 |
5 |
1,724,400 |
Tunnel furnace clay hollow brick |
17 |
200mm thick hollow brick wall |
m3 |
5 |
1,657,800 |
Tunnel furnace clay hollow brick |
18 |
100mm thick solid brick wall |
m3 |
5 |
2,700,400 |
Tunnel furnace solid hollow brick |
19 |
200mm thick solid brick wall |
m3 |
5 |
2,441,900 |
Tunnel furnace solid hollow brick |
20 |
Mortar plastering to finish external wall. |
m2 |
100 |
96,583 |
True aggregate and grade 75 |
21 |
Mortar plastering to finish internal wall. |
m2 |
100 |
86,583 |
True aggregate and grade 75 |
22 |
Mortar plastering to surface of concrete |
m2 |
100 |
126,827 |
True aggregate and grade 75 |
23 |
Tiling ceramic tiles on floor |
m2 |
100 |
268,899 |
Tile price under 150.000VND/m2 |
24 |
Tiling ceramic tiles on wall |
m2 |
50 |
268,899 |
Tile price under 150.000VND/m2 |
25 |
Tiling granite stone on wall, floor |
m2 |
50 |
927,030 |
Domestic goods |
26 |
Exposed gypsum ceilling board |
m2 |
50 |
123,500 |
9mm thick board, Vinh Tuong frame |
27 |
Concealed gypsum ceilling board |
m2 |
50 |
146,000 |
9mm thick board, Vinh Tuong frame |
28 |
Plastic ceilling |
m2 |
50 |
108,360 |
|
29 |
Putty mastic on wall |
m2 |
100 |
23,590 |
Joton skimcoat (putty powder) |
30 |
Putty mastic on structural concrete |
m2 |
100 |
23,590 |
Joton skimcoat (putty powder) |
31 |
Painting emulsion outdoor |
m2 |
100 |
24,960 |
01 primer + 2 coats ICI Maxillite |
32 |
Painting emulsion indoor |
m2 |
100 |
19,440 |
01 primer + 2 coats ICI Maxillite |
33 |
Waterproof according technological process |
m2 |
50 |
170,569 |
Sika Technology |
34 |
Drywall - 1 side |
m2 |
30 |
203,500 |
12mm thick board, Vinh Tuong frame |
35 |
Drywall - 2 sides |
m2 |
30 |
274,300 |
12mm thick board, Vinh Tuong frame |
36 |
Insulating roof floor |
m2 |
100 |
257,019 |
Hollow brick and light weight concrete |
37 |
Tiling tiles on roof |
m2 |
100 |
222,250 |
Dong Tam tile |
38 |
Tiling edge, tiles on roof |
vieân |
30 |
42,630 |
Dong Tam tile |
39 |
Portal frame (column, rafter, beam,canopy) |
kg |
3000 |
30,767 |
CT3 steel, VN building code |
40 |
Small steel structures |
kg |
1000 |
38,472 |
CT3 steel, VN building code |
41 |
Purlin (CT3 steel + oil painted) |
kg |
2000 |
28,275 |
CT3 steel, VN building code |
42 |
Tiling hole plate steel on floor (4mm thick) |
m2 |
50 |
886,042 |
CT3 steel, VN building code |
43 |
Tiling 20mm thick cemboard (100kG/m2) |
m2 |
50 |
220,600 |
Thong Hung board |
44 |
Covering Zinc sheet on roof |
m2 |
100 |
166,201 |
Hoasen, Povina sheet |
Note: Unit price may be changed depending on construction location, condition and work volume..
VAN TUONG ENGINEERING CONSTRUCTION JOINT STOCK COMPANY
Address: 211 Nguyen Trong Tuyen Str., Ward 8, Phu Nhuan Dist., HCMC
Hotline : 0913 155 552 - ĐT : (84-8) 221 821 57
Fax : (84-8) 399 504 17 - MST : 0 3 0 7 2 2 4 5 0 7
Email : This e-mail address is being protected from spambots. You need JavaScript enabled to view it - Website : www.vantuong.vn