VAN TUONG CONSTRUCTOR - CONSTRUCTION UNIT PRICE OF TOWNHOUSE, VILLA

 

* The following unit price is just for reference of financial preparation. Unit price of contract will be determined after having a final design document, as for the requirements of material types as well as assignments, we shall have an official quotation attached to The Agreement of Exchange Conditions.

........................................................................................................................................................

A

Tender Package

Average Rate of Investment

Superior Rate of Investment

 

Manpower and materials for plain construction. (The price may be changed by area volume and construction condition)

" 2.600.000 đ/m2  ---> 3.200.000 đ/m2 "

" 3.000.000 đ/m2  ---> 4.000.000 đ/m2 "

 

Finishing materials (The price may be changed by choosing mareial)

" 1.000.000 đ/m2  ---> 1.500.000 đ/m2"

" 1.800.000 đ/m2  to upper

B

Materials name

Average Rate of Investment

Superior Rate of Investment

Reinforced concrete pile

General market

Ordering options

Sand for leaning, filling, leveling

Normal sand, Debris

Stone agg.0x4, Sand agg.

Sand for mortar, concrete

1st grade, yellow sand

1st grade, yellow sand

Hollow brick, Solid brick

Made in Binh Duong

Tuynel Dong Nai

Stone agg 1x2, 4x6

General market

From Hoa An, Dong Nai

Concrete structures

Cast in place concrete

Ready mixed concrete

Cement

Fico, Cotec

Ha Tien 1, Holcim

Reinforced bar

Pomina

Pomina, Vina Kyoei

Cement Mortar

Grade 50-75

Grade 50-75

Supply and drainage pipes

Binh Minh PVC

Vespo PPR , Binh Minh PVC

Hot water supply pipe

Sunmax PPR

Vespo PPR

Electric conduit

Sino, Chengli, chống cháy

Clipsal

Electric wire

Cadivi

Cadivi

TV, Tele, Net wire

5C, Sino, Krone

5C, Sino, Krone

C

Materials name

Average Rate of Investment

Superior Rate of Investment

Skimcoat (putty powder)

Joton

ICI Cemputty

Emulsified paints

ICI Maxilite

ICI Dulux Weathershield

Tiles for tiling wall, floor

Dong Tam, American

Viet ceramic, Nero ceramic

Granite stone

Under 900.000 VND/m2

Under 2.500.000 VND/m2

Hand of railing

Oil painted steel

Hard wood, Stainless

Handrail for stairs, balcony

Oil painted steel frame

Stainless + Tempered glass

Gate

Oil painted hollow steel

Oil painted hollow steel

Bedroom door

Artificial wood

Natural hard wood

Windows and doors

Glass + Aluminium frame

Tempered glass + Alu frame

Bathroom door

Glass + Aluminium frame

Tempered glass + Alu frame

Locker

Taiwan

Korea, Italia

Water tank

Son Ha, Dai Thanh

Toan My

Washing sink + faucet

Inax

Toto

Toilet seat, Lavapo

Inax .

Toto

Bathroom fittings

Inax

Toto

Switch, socket, MCB

Pana

Clipsal

Lamps

Philip

Philip, Para

D

Without including

 

 

 

Solar hot water system

Son Ha

Ariston

 

Air conditioning system

LG, Hitachi, Sanyo, Sharp

Toshiba,Daikin

 

Kitchen cabinet

Soft wood

Hard wood

 

Wardrobe

Soft wood

Hard wood

 

* The following unit price is just for reference of financial preparation. Unit price of contract will be determined after having a final design document, as for the requirements of material types as well as assignments,  we shall have an official quotation attached to The Agreement of Exchange Conditions.

 

E. The costing m2 cons. way

1. Foundation : Depending on physical properties of soil and kinds of foundation, we have upper 40% cost to compare with area of ground floor cost.

2. Basement : Charged 150% to upper its areas cost.

3. Ground floor : Charged 100% its areas cost.

4. Mezzanine : Charged 100% its areas casting concrete + 70% the rest of areas.

5. Upper storeys : Charged 100% its areas cost.

6. Terrace floor : Charged 100% its areas having roof + 70% the rest of areas.

7. Sheet roof : 30% area; Nomal tile roof : 50% ; Concrete roof 70%, Concrete + tile roof  : 100% diện tích

8. Fence, Garden : Charged depeding on investing rate.

* Dear investing owner should care with completely document and the requesting materials then how much total investing price for the project for avoiding " the matrix" charged on m2

 

F. Adding remark for all manpower and material of plain construction tender package

Works and items will not be included in manpower cost :

"  Carpentry and joinary : handrailing, door and window, cabinet, wardrobe,…

  Erection, install, fitting steel stuffs.

  Tiling granite stone, wood plate for stair, steps...

  Install gypsum ceilling, drywall. Erection glass wall... .

  Install: Door, window, roller door, gate, sliding door...

  Install: Air-conditioning. lightning protection, fire alarm, fire fighting, camera system.

  Connecting etectricity and fresh water from supply servive.

  Erection of steel structure.

  Water heater and solar hot water system."

 

"Contract information:

VAN TUONG CONSTRUCTION JOINT STOCK COMPANY

Address: 211 Nguyen Trong Tuyen St., Ward 8, Phu Nhuan Distric, HCMC, VN

Hotline: 0913 155 552 - Phone: (84-8) 221 821 57 - Fax: (84-8) 399 504 17

Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it – www.vantuong.vn

 

Giới thiệu hình ảnh thi công xây dựng

 
001_thi cong xay dung
002_thi cong xay dung
003_thi cong xay dung
004_thi cong xay dung
005_thi cong xay dung
006_thi cong xay dung
007_thi cong xay dung
008_thi cong xay dung
009_thi cong xay dung
010_thi cong xay dung
011_thi cong xay dung
012_thi cong xay dung
013_thi cong xay dung
014_thi cong xay dung
015_thi cong xay dung
016_thi cong xay dung
017_thi cong xay dung
018_thi cong xay dung
019_thi cong xay dung
020_thi cong xay dung
021_thi cong xay dung
022_thi cong xay dung
023_thi cong xay dung
024_thi cong xay dung
025_thi cong xay dung
026_thi cong xay dung
027_thi cong xay dung
28_thi cong xay dung