VAN TUONG CONSTRUCTOR - CONSTRUCTION UNIT PRICE OF TOWNHOUSE, VILLA
* The following unit price is just for reference of financial preparation. Unit price of contract will be determined after having a final design document, as for the requirements of material types as well as assignments, we shall have an official quotation attached to The Agreement of Exchange Conditions.
........................................................................................................................................................
A |
Tender Package |
Average Rate of Investment |
Superior Rate of Investment |
|
Manpower and materials for plain construction. (The price may be changed by area volume and construction condition) |
" 2.600.000 đ/m2 ---> 3.200.000 đ/m2 " |
" 3.000.000 đ/m2 ---> 4.000.000 đ/m2 " |
|
Finishing materials (The price may be changed by choosing mareial) |
" 1.000.000 đ/m2 ---> 1.500.000 đ/m2" |
" 1.800.000 đ/m2 to upper |
B |
Materials name |
Average Rate of Investment |
Superior Rate of Investment |
|
Reinforced concrete pile |
General market |
Ordering options |
Sand for leaning, filling, leveling |
Normal sand, Debris |
Stone agg.0x4, Sand agg. |
|
Sand for mortar, concrete |
1st grade, yellow sand |
1st grade, yellow sand |
|
Hollow brick, Solid brick |
Made in Binh Duong |
Tuynel Dong Nai |
|
Stone agg 1x2, 4x6 |
General market |
From Hoa An, Dong Nai |
|
Concrete structures |
Cast in place concrete |
Ready mixed concrete |
|
Cement |
Fico, Cotec |
Ha Tien 1, Holcim |
|
Reinforced bar |
Pomina |
Pomina, Vina Kyoei |
|
Cement Mortar |
Grade 50-75 |
Grade 50-75 |
|
Supply and drainage pipes |
Binh Minh PVC |
Vespo PPR , Binh Minh PVC |
|
Hot water supply pipe |
Sunmax PPR |
Vespo PPR |
|
Electric conduit |
Sino, Chengli, chống cháy |
Clipsal |
|
Electric wire |
Cadivi |
Cadivi |
|
TV, Tele, Net wire |
5C, Sino, Krone |
5C, Sino, Krone |
|
C |
Materials name |
Average Rate of Investment |
Superior Rate of Investment |
|
Skimcoat (putty powder) |
Joton |
ICI Cemputty |
Emulsified paints |
ICI Maxilite |
ICI Dulux Weathershield |
|
Tiles for tiling wall, floor |
Dong Tam, American |
Viet ceramic, Nero ceramic |
|
Granite stone |
Under 900.000 VND/m2 |
Under 2.500.000 VND/m2 |
|
Hand of railing |
Oil painted steel |
Hard wood, Stainless |
|
Handrail for stairs, balcony |
Oil painted steel frame |
Stainless + Tempered glass |
|
Gate |
Oil painted hollow steel |
Oil painted hollow steel |
|
Bedroom door |
Artificial wood |
Natural hard wood |
|
Windows and doors |
Glass + Aluminium frame |
Tempered glass + Alu frame |
|
Bathroom door |
Glass + Aluminium frame |
Tempered glass + Alu frame |
|
Locker |
Taiwan |
Korea, Italia |
|
Water tank |
Son Ha, Dai Thanh |
Toan My |
|
Washing sink + faucet |
Inax |
Toto |
|
Toilet seat, Lavapo |
Inax . |
Toto |
|
Bathroom fittings |
Inax |
Toto |
|
Switch, socket, MCB |
Pana |
Clipsal |
|
Lamps |
Philip |
Philip, Para |
|
D |
Without including |
|
|
|
Solar hot water system |
Son Ha |
Ariston |
|
Air conditioning system |
LG, Hitachi, Sanyo, Sharp |
Toshiba,Daikin |
|
Kitchen cabinet |
Soft wood |
Hard wood |
|
Wardrobe |
Soft wood |
Hard wood |
* The following unit price is just for reference of financial preparation. Unit price of contract will be determined after having a final design document, as for the requirements of material types as well as assignments, we shall have an official quotation attached to The Agreement of Exchange Conditions.
E. The costing m2 cons. way
1. Foundation : Depending on physical properties of soil and kinds of foundation, we have upper 40% cost to compare with area of ground floor cost.
2. Basement : Charged 150% to upper its areas cost.
3. Ground floor : Charged 100% its areas cost.
4. Mezzanine : Charged 100% its areas casting concrete + 70% the rest of areas.
5. Upper storeys : Charged 100% its areas cost.
6. Terrace floor : Charged 100% its areas having roof + 70% the rest of areas.
7. Sheet roof : 30% area; Nomal tile roof : 50% ; Concrete roof 70%, Concrete + tile roof : 100% diện tích
8. Fence, Garden : Charged depeding on investing rate.
* Dear investing owner should care with completely document and the requesting materials then how much total investing price for the project for avoiding " the matrix" charged on m2
F. Adding remark for all manpower and material of plain construction tender package
Works and items will not be included in manpower cost :
" Carpentry and joinary : handrailing, door and window, cabinet, wardrobe,…
Erection, install, fitting steel stuffs.
Tiling granite stone, wood plate for stair, steps...
Install gypsum ceilling, drywall. Erection glass wall... .
Install: Door, window, roller door, gate, sliding door...
Install: Air-conditioning. lightning protection, fire alarm, fire fighting, camera system.
Connecting etectricity and fresh water from supply servive.
Erection of steel structure.
Water heater and solar hot water system."
"Contract information:
VAN TUONG CONSTRUCTION JOINT STOCK COMPANY
Address: 211 Nguyen Trong Tuyen St., Ward 8, Phu Nhuan Distric, HCMC, VN
Hotline: 0913 155 552 - Phone: (84-8) 221 821 57 - Fax: (84-8) 399 504 17
Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it – www.vantuong.vn