Mở rộng

Preliminary Estimate

www.thicongxaydung.vn
General Information
Type of house Types of roof Road limit (m)
Investment level foundation type Construction area (district)
Information works
Width (m)
x
Length (m) Basement floor Ground Mezzanine Floor
Spacing of column
Ground floor area (m2)   Terrace Elevator Fence, gate (m)
Cost estimates results
Total areas 0 m2   Total construction areas 0 m2

Contents Unit Quantity Unit Price Amount TOTAL VALUE OF THE INVESTMENT ESTIMATE (A+B+C+D)
A1 Foundation and pile (if any) Total 0 0 0
A2 Human resources and raw materials m2 0 0 0
A Total value of raw construction (A1+A2) 0 0
B Finishing materials, electricity, w.c. accessories m2 0 0 0
C Fence, gate md 0 0 0
D Refrigeration, Hot water system, wall cabinets, kitchen cabinets; Kitchen equipment 0



Giới thiệu hình ảnh thi công xây dựng

 
001_thi cong xay dung
002_thi cong xay dung
003_thi cong xay dung
004_thi cong xay dung
005_thi cong xay dung
006_thi cong xay dung
007_thi cong xay dung
008_thi cong xay dung
009_thi cong xay dung
010_thi cong xay dung
011_thi cong xay dung
012_thi cong xay dung
013_thi cong xay dung
014_thi cong xay dung
015_thi cong xay dung
016_thi cong xay dung
017_thi cong xay dung
018_thi cong xay dung
019_thi cong xay dung
020_thi cong xay dung
021_thi cong xay dung
022_thi cong xay dung
023_thi cong xay dung
024_thi cong xay dung
025_thi cong xay dung
026_thi cong xay dung
027_thi cong xay dung
28_thi cong xay dung